  • Garage summary

    I have added some more content on my website at http://vitessesteve.co.uk/garage/garage_project  was
     http://www.geocities.com/steveweblin/garage/garage_project.htm any questions please ask. I know how useful it was to talk through the options with various friends and my architect before starting the job.

  • Garage Doors Fitted



    Now for the electrics.

  • studs etc

    Extra brickwork sorted by Tony yesterday.

    New studs fitted today this morning before the rain came. How I wish my garage was sorted at times loke this. Working outdoors and having to search through all my stuff in the cellar before finding the right tools etc makes a simple job like replacing the studs so much more time consuming and uncomfortable.

  • the return of Tony

    Tony the brickie who did the original brickwork has agreed to do the extra brickwork I need so that the doors can be fitted by Total Supplies later.

  • the return of Total Supplies

    I have decided to get the firm that supplied the doors to fix em. April 18th is door day. Now to try to get Tony the brickie back to sort the extra brickwork needed.

  • Getting the doors to fit

    Why is it that nothing is ever as easy as you first thought.



    Unfortunately I now find that the doors are not as easy to fit as I first thought. I took the measurements from the plans for the garage. What I did not know at the time was that the all thou the brickwork on the outside face of the garage raises straight from the ground inside it is different. The brickwork piers do not raise to full height only as far as the lintels over the doorways.

    The brackets to hold the roller doors has to be fixed above the opening but in the same plain as the vertical tracks for the doors to run in.

    Seems that I will have to extend the brickwork piers up and have the tracks for the doors mounted on the inside face of the brickwork.

  • roof on


    A couple of pictures showing the new roof inside and out. The work took two days – with the roofers on site both Monday and Tuesday. The last skip went yesterday.

  • Final payment to Chic + pictures


    All the building work has taken its toil on the lane, it is sea of mud just now. The verges will recover soon. I can see the snowdrops already. Our wild life hedge is also starting to show signs of life. There are remains of the ivy and brambles that were growing on the old garage so I expect that will recover as well.

    Talking to Paddy one of my neighbours I found out a possible reason for all the old bricks and stuff that the builders found. Apparently during the second world war parts of the lane were dug up to build air raid shelters for the little houses the other side of Victoria Street and the people living in the yards off Parliament Street.

    .

    A view of the concrete floor and the threshold that spreads out onto the verge of the lane.

    Have made the final payment Chic the builder today. That only leaves the roof to be fitted and be paid for; the vehicle doors to fit and the electrics to be fitted by me.

    My neighbours are going to fit a gate to the alley on the far side of the garage in the picture above.

  • Just got laid

    The garage floor has been put in today. Loads of sand then crushed stone followed by slab, damp proof course then floor slab.

    Need the roof and vehicle doors to finish the building work. Roof, gutters and downpipes are due to be fitted on Monday.